Explore service stages, practical resources and common questions in one place. Choose your project stage or go straight to the information you need.
01
Define the task first.
Evaluation starts with the feed and the desired output. Equipment comparisons become useful when the material, fractions and site constraints are considered together.
YOU PROVIDE
Feed source and photos, target fractions and contaminants, desired throughput, layout and existing equipment. Include normal variation and difficult samples.
WE WORK THROUGH
Agree samples and measurement definitions, evaluate recognition and separation, review configuration and line interfaces, and consider labour, utilities and output destinations in investment discussions.
PROJECT OUTPUT
A feed and target brief, evaluation records, a proposed configuration and a list of conditions requiring site confirmation.
02
Connect the equipment to the plant.
Installation is not the final step. Commissioning checks the relationships between material flow, mechanical structures, electrical systems, air and controls.
YOU PROVIDE
Confirm delivery and lifting access, power and air, upstream and downstream interfaces, shutdown windows and the operators and maintainers joining commissioning.
WE WORK THROUGH
Check installation and interlocks against the project plan, commission without and with material, and sample main and reject streams under agreed conditions.
PROJECT OUTPUT
Interface and commissioning records, operator training, acceptance records and an outstanding-items plan, with daily checks and maintenance requirements handed over.
03
Plan maintenance. Preserve diagnostic evidence.
Operational support relies on the state before and after an event. Equipment records, feed changes and completed checks are more useful than a general report of lower performance.
YOU PROVIDE
Machine model, alarms, event timing, photos or video, recent feed or setting changes, and checks already completed.
WE WORK THROUGH
Analyse records within the agreed support scope and arrange remote diagnosis or site inspection. Maintenance planning covers cleaning, consumables, spares and required calibration.
PROJECT OUTPUT
An issue record and response plan, spares or maintenance arrangements, and before-and-after conditions for any setting changes.
04
When the feed changes, revisit the decision.
New sources, seasonal changes and revised customer requirements can alter the separation task. Distinguish feed, sensing and execution constraints before discussing expansion.
YOU PROVIDE
Differences between old and new feed, revised fractions, current product and reject samples, and available space and shutdown conditions.
WE WORK THROUGH
Retest representative samples, review model and execution suitability, and compare the effects of setting changes, sensor combinations and added stages.
PROJECT OUTPUT
Retest records and adjustment or expansion proposals, with quality, recovery and throughput conditions requiring renewed validation.
FOR EQUIPMENT IN OPERATION
Turn an issue report into useful evidence.
Organise information around the event to distinguish feed changes, recognition issues, execution deviation and interface faults. Follow the equipment manual and site procedures for physical checks.
Selection, samples, installation and maintenance. Search by keyword to find the issue you are working on.
Platform selection
How do vision and spectral sorting differ?+
Vision focuses on colour, shape and appearance; spectral sensing provides material-related features. Define the fractions first, then use samples to establish whether one sensing method or a combination is appropriate.
Can a sorter handle mixed feed directly?+
Assess particle size, overlap, moisture and contamination variation first. Dosing, screening and necessary preparation affect recognition and execution. Difficult mixed streams should be evaluated as a complete route.
Which platform fits a constrained site?+
Compare tower integration and mini platforms, while checking clear height, transfers, outlets and service access. A layout and target fractions are more useful than machine dimensions alone.
Is outlet count the same as recognised category count?+
No. Categories may share an outlet, and recirculation changes tasks between passes. Confirm stages, bins and simultaneous outputs for the model and process.
How should I compare a tower and a mini platform?+
Compare fractions and stages first, then clear height, outlets, conveying and service access. Towers concentrate stages; compact standalone units focus on a task. Machine dimensions do not replace complete site planning.
Samples & acceptance
What information should accompany a sample?+
Record source, target fractions, contamination and size range. Include normal variation and difficult fractions. Agree sample quantity, packaging and shipment with engineering.
Why is accuracy alone insufficient?+
Purity, recovery and throughput describe different outcomes. Agree fractions, sampling and measurement definitions, and inspect residuals so a single figure does not hide target-material loss.
Can dark or composite plastics be separated?+
Capability depends on material, surface condition, sensor configuration and the separation objective. Validate representative samples rather than applying one configuration’s result to every material.
How does receiving valuation differ from a material trial?+
Valuation equipment connects receiving orders, categories and weights for transaction review. A material trial examines a separation task and its outputs using agreed samples, settings and metrics.
Should I provide both bottles and flakes?+
For projects covering both bottle sorting and post-wash purification, provide information for each stream. Grinding and washing change size, surface and moisture, so agree sample quantities and validation conditions separately.
Installation & support
Can an existing line be upgraded in stages?+
Identify the bottleneck, then check conveyors, utilities, controls and the available shutdown window. Evaluate an added machine, a replacement module or staged upgrades around retained equipment and new goals.
What should be ready before installation?+
Prepare the layout, feed and discharge interfaces, utilities, delivery and lifting access, and commissioning personnel. Specific requirements follow the project configuration and site review.
How is the service scope agreed?+
Agree spares, consumables, training, remote diagnostic conditions and site-service scope during the project. Response times, warranty periods and charges follow the confirmed project terms.
Which interfaces does the management software provide?+
Product material shows Web management, maintenance APP, receiving, mini-program and dashboard interfaces. Confirm modules, permissions and business integration within the delivered scope.
What should I record before discussing a retrofit?+
Record the route from feeding and transfers through sensing to discharge, including overlap, accumulation and reject locations. Provide layout, belt width and speed, utilities and controls, plus the current issue and shutdown limits.