← ALL EQUIPMENT / OPTICAL
02 / TOWER VISION SORTER

Go vertical.
Sort further.

Vertically combined sorting units identify and separate mixed material in successive stages. Configure stages, outlets and target groups around the fractions you need.

Tower Vision Sorter
AISORT / 02
Preparing 3D view
Multi-stage sorting, one vertical system.SCROLL TO EXPLORE ↓
THE ROLE IN YOUR LINE

Several stages. One vertical route.

Feed enters at the upper level and follows successive sensing and ejection stages. The tower reduces intermediate conveying between its internal stages. The complete line still requires feeding, collection and supporting equipment.

Multi-stage recognition and routing

At each stage, visual classification and localisation inform timed ejection. Configure bin targets, combined outlets and return routes around the required fractions, checking feed presentation, air supply and upstream and downstream interfaces together.

Vertical sorting stagesConfigurable outlet targetsGrouped targets and recirculation
01

Vertical integration

Arrange multiple sorting tasks together, with clear height, outlets and service access considered.

02

Configurable bin targets

Assign categories to stages and outlets in the operator interface. Match software settings to physical bin labels.

03

Grouped separation

Collect several target categories through one outlet when they share the next processing step.

04

Recirculation

Use configured buffers and return routes for another sorting task. Include the recirculating load in line planning.

FOLLOW THE MATERIAL

From input
to the next possibility.

MULTI-STAGE SORTINGDEDICATED OUTPUTS
PROCESS / 01Feed from above
01 / 04

Feed from above

Prepare the feed for the task and introduce it at the upper level.

02 / 04

Identify and locate

Capture colour, shape and packaging features; classify and locate each target.

03 / 04

Separate by stage

Each stage ejects its configured targets into the corresponding discharge route.

04 / 04

Collect or recirculate

Collect the fractions or return a selected stream through the configured route for another task.

IN THE WORKFLOW

One set of outlets Different tasks

Group categories when they share an output destination. Discuss further separation or recirculation when separate sale or processing is required.

Every branch has a destination

Define whether each stream enters a buffer, delabelling, grinding, baling or another sorting stage. Plan service routes alongside material routes.

WHERE IT FITS

Built around
your material.

01

PET & HDPE bottles

02

Mixed rigid packaging

03

Compact recovery plants

04

Pre-wash sorting

TECHNICAL PROFILE

The configuration
behind the process.

Reference figures support initial selection. Throughput, belt speed and separation depend on the model, material, feed presentation and air supply. Confirm the final configuration and capability through technical information and material trials.

Request technical information ↗
Tower Vision Sorter configuration
Reference throughput / module1–8 t/h
ArchitectureVertically combined sorting units
Target settingsAssign categories to outlets and group suitable targets
SensingVision; additional sensing follows the model and task
DischargeStages, bins and return routes confirmed per configuration
SoftwareMonitoring, task settings and category statistics as configured
Selection inputsFeed, fractions, height, air supply and discharge interfaces
Tower Vision Sorter enlarged
BEFORE YOU SPECIFY

Practical questions.

Are stages, outlets and recognised categories the same count?+

No. Categories may share an outlet, and recirculation changes the task between passes. Confirm the stages and bins for the selected model.

Does the complete line need no conveyors?+

The tower concentrates its internal stages. Feeding, discharge, recirculation and auxiliary processes still require appropriate handling.

How are tasks changed?+

Update supported category-to-outlet assignments, check bin labels and downstream destinations, then validate with the actual feed.

YOUR MATERIAL. YOUR NEXT MOVE.

Let’s find
the separation.

Share your feedstock, recovery targets and plant layout. Build the next step with an AISORT engineer.

Talk to sales engineering ↗